Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

I was chosen for the Design team at the start of this semester. For this semester, the Design team is focusing on "cleaning up" some of the existing Agua Clara code that exists (communication of filter plumbing, logo/disclaimer layout on webpage), and creating code for some of the newer additions to Agua Clara (generation of details for Chemical Dose Controller,/Low Flow Orifice Meter).  The design team will be responsible for editing the existing code for any alterations to the existing Agua Clara design so that the Design server generates drawings that are up to date. Also, the Design team will be working on creating a "Water Treatment Selection Guide", which takes input water quality data and suggests the optimal treatment train.I am focusing on making modifications to the Agua Clara design code for high flow conditions. First, I am researching potential solutions for entrance tank flow control under high flow. Currently, the flow control pipe allows the plant operator to dump water up to the entire plant capacity by opening a bronze gate valve. For plants with larger capacity, the bronze gate valve required is larger. This is problematic because the prices on these valves become exorbitant at sizes larger than 2'' or 3''. I am currently assessing potential solutions that include: multiple flow control pipes/valves at smaller sizes, and the use of different valve types that are readily available in Honduras. My goal is to minimize the cost of entrance tank flow control while providing a simple design with materials available in Honduras. This change may ultimately be implemented into the design code so that the design may be featured in high-flow designs created by the Design Tool.