Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Spring 2012 Contributions

...

  • Worked to produce designs for a Ram Pump testing apparatus.
  • Helped design an orifice flow meter that is easy to integrate into a 1" schedule 40 piping system and is monitored by process controller.
  • Helped to design a check valve that has an adjustable closing point based on the velocity of water flowing past it.