Jae's Individual Contribution Page

Summer 2010

I helped run some clay experiments and learned how to use the process controller and the lab bench-scale setup. I also helped troubleshoot some mechanical errors in the lab system.

Fall 2010

This semesterThis Fall, I have joined the Plate Settler Spacing team. So far, I ran some tube settler clay experiments and set up a basis to run the smaller diameter Aluminum tubes to quantify extreme failure due to the I analyzed the calculations need for the aluminum tube high velocity gradient experiments.