Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Fall 2010 Challenges

View FileChallenges Design Fall 2010Challenges Design Fall 20101^Design Team Fall 2010 Challenges.doc

Design (15) in Accel
Inlet Manifold (4) in B60
Lime Feeder (4) in B63 along wall next to the door
Tube Floc (4) in B60
Stacked Filter (6) in B63 along window: two team members as joint members of Design team
Foam Filter (4) in B63 on left end of bench top
Plate Settle Spacing (4) in B60
Chemical Dose Controller (6) in B60: two team members as joint members of Design team
Outreach (3-5)
(estimated number of students per team)

Team organization survey

Include Page
AGUACLARA:Challenges Design Fall 2010
AGUACLARA:Challenges Design Fall 2010
Include Page
AGUACLARA:Challenges Inlet Manifold Fall 2010
AGUACLARA:Challenges Inlet Manifold Fall 2010
Include Page
AGUACLARA:Challenges ANC Fall 2010
AGUACLARA:Challenges ANC Fall 2010
Include Page
AGUACLARA:Challenges Tube Floc Fall 2010
AGUACLARA:Challenges Tube Floc Fall 2010
Include Page
AGUACLARA:Challenges Stacked Filter Fall 2010
AGUACLARA:Challenges Stacked Filter Fall 2010
Include Page
AGUACLARA:Challenges Foam Filter Fall 2010
AGUACLARA:Challenges Foam Filter Fall 2010
Include Page
AGUACLARA:Challenges PSS Fall 2010
AGUACLARA:Challenges PSS Fall 2010
Include Page
AGUACLARA:Fall 2010 CDC Development
AGUACLARA:Fall 2010 CDC Development
Include Page
AGUACLARA:Outreach Challenges for Fall 2010
AGUACLARA:Outreach Challenges for Fall 2010