Fall 2010 Challenges

View File
Challenges Design Fall 2010^Design Team Fall 2010 Challenges.doc
Challenges Design Fall 2010^Design Team Fall 2010 Challenges.doc

Design (15) in Accel
Inlet Manifold (4) in B60
Lime Feeder (4) in B63 along wall next to the door
Tube Floc (4) in B60
Stacked Filter (6) in B63 along window: two team members as joint members of Design team
Foam Filter (4) in B63 on left end of bench top
Plate Settle Spacing (4) in B60
Chemical Dose Controller (6) in B60: two team members as joint members of Design team
Outreach (3-5)
(estimated number of students per team)

...