Fall 2010 Detailed Task List

A Detailed Task List was created to lay out the planned research for the CDC team for Fall 2010.

Reflection Report I provides a detailed description of the planned research and what we think is the game plan in order to scale the apparatus.

Reflection Report II provides a sketch of what the improved CDC apparatus will look like (using two chemicals and pulleys to control the entrance tank float)

CDC Design Summary

The purpose of this Design Summary is to provide continuity between Chemical Dose Controller teams during the transition from Summer 2010 to Fall 2010. It is not the intention of this document to replace the critical information already posted on various wiki pages but instead to help consolidate and summarize the work done to-date and lay out what still needs to be accomplished.

This document will introduce the history of the AguaClara Chemical Dose Controller, discuss the state of the current dose controller design, summarize some basic design constraints and discuss the next steps in the design process. Understand that this is an evolving process and these parameters may change.

Fall 2010 Detailed Task List

Once the team has familiarized itself with the status of the Chemical Dose Controller, a Detailed Task List should be created to lay out the semester's plan.