Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Fall 2010 Challenges

Design (15) in Accel
Inlet Manifold (4) in TBD
Lime Feeder (4) in B60B
Tube Floc (4) in B60A
Stacked Filter (6) in B60B: two team members as joint members of Design team
Foam Filter (4) in B60B
Plate Settle Spacing (4) in B60A
Chemical Dose Controller (6) in B60A: two team members as joint members of Design team
(estimated number of students per team)

Team organization survey

Include Page
AGUACLARA:Challenges Design Fall 2010
AGUACLARA:Challenges Design Fall 2010
Include Page
AGUACLARA:Challenges Inlet Manifold Fall 2010
AGUACLARA:Challenges Inlet Manifold Fall 2010
Include Page
AGUACLARA:Challenges ANC Fall 2010
AGUACLARA:Challenges ANC Fall 2010
Include Page
AGUACLARA:Challenges Tube Floc Fall 2010
AGUACLARA:Challenges Tube Floc Fall 2010
Include Page
AGUACLARA:Challenges Stacked Filter Fall 2010
AGUACLARA:Challenges Stacked Filter Fall 2010
Include Page
AGUACLARA:Challenges Foam Filter Fall 2010
AGUACLARA:Challenges Foam Filter Fall 2010
Include Page
AGUACLARA:Challenges PSS Fall 2010
AGUACLARA:Challenges PSS Fall 2010
Include Page
AGUACLARA:Challenges CDC Fall 2010
AGUACLARA:Challenges CDC Fall 2010