Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Fall 2010 Challenges

estimated number of students per team
Design (15) in Accel
Inlet Manifold (4) in TBD
Lime Feeder (4) in B60B
Tube Floc (4) in B60A
Stacked Filter (6) in B60B: two team members as joint members of Design team
Foam Filter (4) in B60B
Plate Settle Spacing (4) in B60A
Chemical Dose Controller (6) in B60A: two team members as joint members of Design team
(estimated number of students per team)