Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Summer 2010 CDC Research

A Detailed Task List was created to lay out the planned research for the CDC team for this summer.

Reflection Report I provides a brief history of the evolution of the Chemical Dose Controller along with a detailed description of the planned research.

Reflection Report II describes and analyzes the results of the team's research with Legris polyamide push-connect caps.

Reflection Report II was created to lay out the planned research for the CDC team for this summer.