AguaClara Filtration Team

Abstract

The challenge for the 2010 Spring AguaClara Filtration Team is to design a filtration system for the AguaClara water treatment plant. The filtration system must meet the following requirements: reliably treat the current AguaClara effluent water with a turbidity ranging from 5 to 10 NTU to an effluent turbidity less than 1 NTU, not require any electricity, make minimal use of specialized components that would be difficult to acquire in remote communities, and the system should be easy to construct and to maintain.

...

Advice and Future Challenge to the Future Filtration Team

Past Research - Terminated Methods

Spring 2010 Filtration Team Teach In

...