Kevin and Dave went to the plant to try to get the plant running. However, the in-flow pipe had not been put back together (the flow-meter was supposed to be installed), as Tom had promised. Instead we figured out a way to support the in-flow bucket using metal braces. Decided We decided on a design with Tom, and are going back tomorrow to work on it. 

March 4, 2008

Sara, Kevin and Dave went down to the plant to work on the tank modifications. Kevin and Tom worked on installing the flow-meter, while Sara and Dave prepared the support set up for the flow control device. The bracing system is almost done, but we now need to make some modifications to the flow control bucket to make sure spilling does not occur. The flow-meter will require more work, but significant progress was made on it today.