Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

I edited the Inlet and Exit Channel wiki pages to reflect the new design. The Inlet Channel page was replaced with the Inlet Channel Weir page, which has all the updated information on the channel design. I also edited the information on the exit channel weirs to reflect the changes in the new design and address weir specifications. I changed the information on determining the geometry of the exit channel to take weir design (perpendicular or parallel to length of the channel)into account.

I have further edited the design of the inlet channel tank so that it does not hang off the side of the sedimentation tank. The new design makes the sedimentation tank symmetrical by shifting the inlet tank inward to reflect the design of the exit channel tank.

The inner exit weir elbow has been rotated to face the inlet tank to allow for a connecting pipe for the drainage system. The inlet weir elbow has been transformed to a tee so that the both the exit and inlet tank can have the same drainage system.

I edited the details in the inlet channel design program wiki page so that the exit weir specifications for design are more clear. I also deleted the Inlet Channel Weir wiki page because it was used to replace the inlet channel design page and is no longer needed.

Pages Created

Automated Materials List Design Program
Automated Materials List Inputs
Automated Materials List Outputs