"Fall 2009" Contributions

In Fall 2009, I first worked on the Floating Flocs team where my work included learning the process controller software and then trouble shooting errors related to the functioning of the apparatus (pumps, sensors) as well as configuring working conditions and limits of the same in the process controller software so as to successfully conduct a coordinated experiment with the plate settler spacing team.

Since October 2009, I have been part of the ANC team where my contribution includes summarizing the work done by the previous ANC team and the problems associated with the designs tested by them. I have also actively contributed in the running of all the experiments so far as well as in the analysis of tube length calculations (MathCAD), discussing the problems and solutions with Matt/ Monroe, co ordinating with Paul (for the construction of the slope column lime feeder) and lastly detailed task lists, weekly minutes and mid term reportFirst meeting with Matt for introduction to floating floc experiment.

Pages Created

Wiki Markup
{content-by-user:msp232}{content-by-user}