Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

I have been working on editing the design of the tanks at the end of the inlet and exit channels. The new design has the tanks cantilever off the side of the sedimentation tank, whereas the old design had the tanks extend from the base of the plant to the top of the sedimentation tank. I have edited the MathCAD file "SedTank - w/Pieces" to change the height of the tanks and to reflect the new design. This new design saves materials and allows for the new drainage system.

...