I am a member of the Design team. Currently I am assigned to a sub-team with Jeff Katz and Tai Kim.Our My first task was to redesign the exit channel for the sedimentation tank. It was originally a copy of the entrance channel, and we were my team was tasked with minimizing its width based on head loss requirements.
I worked on creating an initial draft of the code, adding the variable WExitChannelMin to the Variable Naming Guide, and documenting the code once it was completed.

My sub-team is now working on a Drain System a creating a horizontal baffle system for the Flocculator for large flow rates. We are in the research phase, examining the code in order to understand how to modify it for our purposes.