After consulting with engineer Wil Serrano, the ports between the flocculator channel need to be switched from the bottom of the tank to the top. From a structural perspective it is much better to be able to tie the walls together at the top of the wall.
Baffle Spacing and Exit Port
May, Lindsey--7/8/09 tentative
Adding the port that connects the floc tank to the sed tank and arranging the baffles to align with this exit.
Flocculator drain system
Josiah, Taisuk, Jeff - Est. Completion Date 7/12/09
...
This code needs to be heavily edited and brought into compliance with the variable naming protocol.
Entrance tank
...
A first draft of this code has been created, but it has not yet been reviewed.
...