Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

After consulting with engineer Wil Serrano, the ports between the flocculator channel need to be switched from the bottom of the tank to the top. From a structural perspective it is much better to be able to tie the walls together at the top of the wall.

Baffle Spacing and Exit Port
May, Lindsey--7/8/09 tentative

Adding the port that connects the floc tank to the sed tank and arranging the baffles to align with this exit.

Flocculator drain system

Josiah, Taisuk, Jeff - Est. Completion Date 7/12/09

...

This code needs to be heavily edited and brought into compliance with the variable naming protocol.

Entrance tank

...

A first draft of this code has been created, but it has not yet been reviewed.

...