Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Floc Hopper Group

Accomplishments
  • A summary of major work completed since last meeting based on last meeting's identified outcomes/issues
  •  
Issues
  • Difficult and unresolved issues
  • Plans for action

...

  • Determined the most effective parameters for the floc hopper (such as height, width, length) that should allow the floc hopper to fit various geometries of different plants.
  • Revised the MathCad code defining the parameters of the floc hopper.
  • Developed a first draft of the MtoA code for the floc hopper.
  • Added the wedge command to the MtoA translators
Issues
  • Need to add a few variables to the Variable Naming Guide.
  • Must determine the best placement of the floc hopper in various plants.
  • Will test our code with various plant sizes until we determine the best placement for the floc hopper.
Goals for upcoming week
  •  Finish the MtoA code for the floc hopper, so that the floc hopper can be drawn in with the rest of the plant.
  • Document the floc hopper on the wiki, which may include creating a new "floc hopper design program" on the Automated Design Algorithms page.

Materials List Group

Accomplishments

...