(tick) Check with the operators to see if it is permissible to run the pilot plant.
(tick) Check that all the cords, including the power strips, are plugged in.
(tick) Check with the plant operators to make sure they haven't turned off parts of the Filtration Plant for maintenance. The operators are also very helpful in figuring out what might be unplugged or turned off.
(tick) If operating with PAC, ask the plant operators what they are using for their current PAC Dosing, it should be in the range of 8 to 30 ppm.

Starting the inlet pump

Image Added
(Inlet pump in rapid mix chamber)

The inlet pump is the pump that moves water from the Cornell Water Filtration Plant's grit chamber (raw water) to the flocculation tank of the pilot plant. It can be started by plugging it in (plug is above the Water Filtration Plant's rapid mix chamber).

...