  • Replaced tubing through peristaltic pump with size 13 tubing to dose PAC more accurately
  • Fixed loose wiring in fourth turbidimeter so it registers in Process Controller
Metrics
  • Plant is fully operational
  • Tested configuration 1 (1st channel baffle spacing: .051 m, 2nd channel baffle spacing: .051 m)
  • Quantitative and qualitative results from accomplishments and outcomes.
  • Potential metrics for unresolved issues.
Outcomes
  • A summary of resolutions based on what was accomplished.
  • New directions and ideas that result from these resolutions.
Issues
  • Difficult and unresolved issues
  • Plans for actionAre running out of time to complete all configuration profiles before Wiki Report is due. As resolution we completed a counterproposal to extend the due date for submission to Monroe.