Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  • Caulked holes from previous baffle layouts for 32 baffles to allow for reuse on secondary baffle system setup
  • Drilled holes and cut baffles according to Adjustable Baffle System design
  • Cut Pex tubing as spacers for secondary baffle system
  • Assembled secondary baffle system
Outcomes
  • Completed baffles for secondary baffle system to system which when system is complete will allow for one system to be adjusted while another system is in the tank being tested

...