Because the sludge drain is no longer a pipe but now a rectangular channel, this nominal diameter is then used to calculate the required cross-sectional area of the drain. Given the required area for uniform flow, and the depth of the drain, H.SedSludge which is (set to be 5 cm in Design Assumptions), the width of the drain is calculated.

...