Spring 2009 Minutes

February 27, 2009

Working Group: Bubbles

Accomplishments
  • Collected data
  • Solved DO probe bubble problem
  • Posted summaries of articles
  • Wrote Meeting Minutes

...

  • Redo AutoCAD drawing of system
  • Plans for action
  • Doubt about accuracy of DO probe

Working Group: Sand Filter

Accomplishments
  • Ran four tests: without sand, sand at 50mL/min, sand at 100mL/min, and sand at 200mL/min
  • Add more references in the Annotated Bibliography

...

  • DO read that the initial DO is lower than the outflow DO for all experiments.
  • When the setup starts to run, the inflow DO is too low (as low as 4 mg/L).
  • Despite the recalibration of both DO probe, the DO reading still remain incorrect.
  • An attempt to fix the DO probe reading: we switch the orginal inflow DO probe with another DO probe.
  • The flow rate of the setup is not consistent.

Any Overall Team Comments:

  • Great work.