h1. Pilot Plant Meeting Minutes


h2. Spring 2009 Minutes


h3. 2-20-2009

{float:right|border px=2}
!mockup_baffles_1.jpg|width=400! 
{float}

h4. Accomplishments

*Developed and began construction of new baffle system
**1/2" PVC which is already at the lab will be run continuously through the baffles we already use (after holes are drilled in them).
**Baffles will be held in place with segments of reinforced PVC tubing slit spirally lengthwise. These tubes will be placed over the PVC pipe to hold the baffles in place and can easily be removed or added to the pipe.
**Purchased 6' of tubing to test if it will be better to use tubing as clamps (put small segments of the tubing on each side of the baffle) or as spacers (i.e. fill the entire space between consecutive baffles with pieces of the tubing) 
The following proposals were deemed ineffective after deliberation and testing:
* Built mockup of proposed new baffle system using 1/2" PVC pipe and rubber O-rings
**O-rings slid around too much
* Planned several versions for the actual baffle design (speced out components, priced out online)
** 1/4" stainless steel pipe: $10/6 ft from McMasterCarr
*** Will need 4 pipes/channel 
** Tygon tubing (~$1.50/ft) to be used as sleeve around the pipe the keep clamps tight
** Potentially using spring clamps ($13/100 clamps)
** Potentially using Nitrile O-rings
** $8/pk of 100 O-rings


h4. Metrics

* Quantitative and qualitative results from accomplishments and outcomes.
* Potential metrics for unresolved issues.***Couldn't have O-rings on threaded beucase they'd eventually break and entire system would need to be dissembled to replace
***Couldn't have nuts because of length of time to change spacing and in case the nuts ever became chewed out or are unable to be moved

h4. Outcomes

* A summary of resolutions based on what was accomplished.
* New directions and ideas that result from these resolutions.

Have final design for the baffle system
* Obtained materials, began construction
* Will be retrieving rest of current baffle system from the pilot plant and drilling holes in baffles and starting construction of new system.

h4. Issues

* We need to clamp, drillor pressuse bafflesa whendrill wepress buildto fordrill the pilot plant

h4. Issues

* Difficult and unresolved issues
* Plans for actionholes in the baffles so they line up
{float:right|border px=2}
!mockup_baffle_3.jpg|width=400! 
{float}