Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Other team members

  • Rustom Meyer (rlm56)
  • Art Schull (avs32)
  • Eladio Lopez (el447)
  • Michael Liu (ml627)

Challenges

  • (Place Challenge here)
    • (Who is working on this, approximately when will they work on it?)
  • (Place Challenge here)
    • (Who is working on this, approximately when will they work on it?)
  • (Place Challenge here)
    • (Who is working on this, approximately when will they work on it?)

Bibliography

  • Design new, indepedently movable baffles
    • All group members will be working on this for the week of Feb 9th
  • Build one baffle of each of the proposed, viable designs
    • Each group member will have a design to build independently (Feb 16)
  • Analyze prototypes based on cost, ease of construction, practicality, and efficacy
    • Rustom (Feb 22)
  • Procure funding to build new baffle system based on chosen design
    • Full group (Feb 23)
  • Build new baffle system and install at Pilot Plant
    • Full group. Complete after procuring funding. Should take 1-2 weeks to finish.
  • Run the plant, fix any leaks or problems
    • Art, Mike (after new baffle system is in place, early March)
  • Begin research on dose controller at the pilot plant and construct
    • Rustom, Lalo (beginning of March). Collaborate with dose control group.
  • Collect turbidity profiles for different baffle arrangements and tapered vs. non-tapered arrangements
    • Art, Mike (this will be ongoing for several weeks)
  • Set up FReTA to be used with the tube flocculator and use to compare settling velocities at different points in the tube flocculator
    • Jeff (March). Collaborate with Ian.
  • Compare raw water readings from the Pilot Plant FReTA with the laboratory results
    • Jeff (March). Collaborate with Ian.
  • After completion of these challenges, formulate challenges for sedimentation tank and begin research there
    • Full group. After completion of aforementioned goals.

Bibliography

References for our project that our List references for your project that your team has found in literature searches.

  •  
  •  
  •  

Deliverables

What do you plan on "handing in" by the Submissions for end of the semester? Designs, programs, separate reports for publication, etc.semester

  • AutoCAD drawing of new baffle design as well as picture of completed baffle system
  • Turbidity profiles of different baffle spacings
  • Documentation of dose controller at Pilot Plant
  • Settling velocity data for Pilot Plant FReTa
  • Comparison of Pilot Plant FReTa results with lab results
  •  
  •  
  •