  • Familiarize new members with plant and plant processes
  • Get the plant up and running without leaks and problems
  • Design and build new, robust baffle system
  • Install a dose controller to vary alum dosing linearly with plant flow rate
  • Make Process Controller remotely accessible so alum dose can be changed off-site
  • Take turbidity profiles of the flocculator under different arrangements, including tapered and non-tapered baffle spacing
  • Set up FReTA to be used with the tube flocculator
  • Use FReTA to compare settling velocities at different points in the tube flocculator
  • Compare raw water readings from the Pilot Plant FReTA with the laboratory results
  • After completion of flocculation goals, sed tank research will commence