Construction continues to progress on the operator's house. The adobes are made and they are excavating for the foundation.

Both in Ojojona and Tamara, the operators have not been very faithful in filling out the second side of the daily data sheet (with sludge levels, sed tank purge times and barrel levels). It appears that Chris Bordlemeyer was correct that if all of the data is not on one sheet they will not fill it out. However, we think it would be hard to get all of the data on one side of a normal sheet. Since we haven't been doing much with the data from the second sheet, we propose getting rid of it. We can add a few critical data items, such as whether they are sending the effluent to waste and the chlorine residual in the distribution tanks, to the first side. We think it is better that the operator concentrate on filling one critical sheet well instead of doing a mediocre job on two sheets.