Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

KFS Cutover Dress Rehearsal testing: DR#1 (5/2 - 5/13) & DR#2 (5/23 - 6/3)

As I had noted in my 02 28 2011 status report, we had discussed the Final QA period and Entry Criteria for testing at the 01/26/2011 and 02/09/2011 Leads Meeting. I believe much of the criteria is the same for the Dress Rehearsal period. System Test Plan Entrance Criteria .

KFS-PROD Technical

KFS-PROD delivered on 4/28 will be used for the Dress Rehearsal starting on 5/2.

...