2.1-Antibiotic Code System.pdf [reviewed 06/07/16 by ser15 SOP [updated 2020-06-01 by ram524]
2.5-FSL Isolate Designation , and ID Assignment and Maintenance.pdf (Sherry to edit; combined with 2.7 as "Isolate Assignment and Management") moved to General Protocol [updated by ser15 2020-05-18]
2.6-Growth Curve Using the Synergy Plate Reader.pdfH1 Microplate Reader to Perform Growth Curve and ‘Snapshot’ OD readings SOP [updated by cq87 2022-01-13]
2.9-Standardized Growth Protocol for Bacterial Cultures and ODs SOP [reviewed 06/07/16 by ser15]
2.7-Protocol for Freezing Bacterial Isolates.pdf (Sherry to edit; combined with 2.5 as "Isolate Assignment and Management") moved to General210-Glycerol Stock Preparation SOP [updated by ser15 2020-05-18]
Training Record
2.1-Antibiotic Code System | Trainer | ||||||||||||||||||||||||||||||||||||||||||||||||||
Trainee | |||||||||||||||||||||||||||||||||||||||||||||||||||
Training Date | |||||||||||||||||||||||||||||||||||||||||||||||||||
2.5-FSL Isolate Designation, ID Assignment and Glycerol Stock Preparation | Trainer | Rachel E | |||||||||||||||||||||||||||||||||||||||||||||||||
Trainee | Zoe W | ||||||||||||||||||||||||||||||||||||||||||||||||||
Training Date | 8/25/2020 | ||||||||||||||||||||||||||||||||||||||||||||||||||
2.6-Growth Curve Using Synergy Plate Reader | Trainer | ||||||||||||||||||||||||||||||||||||||||||||||||||
Trainee | |||||||||||||||||||||||||||||||||||||||||||||||||||
Training Date | |||||||||||||||||||||||||||||||||||||||||||||||||||
2.9-Standardized Growth Protocol for Bacterial Cultures and ODs |
...
Trainer | |||||||||||||||||||||||||||||||||||||||||||||||||||
Trainee | |||||||||||||||||||||||||||||||||||||||||||||||||||
Training Date |