Snapshot of costs for higher-end computers, including compute cluster systems (high performance, HPC). Purchasing, buying. Contact ChemIT to discuss your needs. |
...
Pricing example for 24 cores
Questions
Value/ utility of (Intel) hyperthreading?
Summary
You want 24 cores. Here are some options, and prices as of Jan 2014.
Top-level options | Cost | Price analysis | Proc | Notes |
---|---|---|---|---|
Typical compute cluster nodes | $5.4K | Getting 24 cores on procs spread over 2 computers represents good value. | Intel Xeon E5 2620 V2 | 4 procs, 2 on each of 2 motherboards. |
Typical compute cluster nodes | $7.3 | Getting 32 cores on procs spread over 2 computers (instead of 24 cores, above). Pay extra for these extra cores: | Intel Xeon E5 2640 V2 | Again, 4 procs, 2 on each of 2 motherboards. Those procs are twice the price. |
Single computer, rack-mount. | $8.5K | To get similar power as $5.4K sytem (24 cores), but merged into a single system, pay . Pay extra: | Intel Xeon E5 4607 (V2 coming soon) | 4 procs, but on one single motherboard. Those procs are twice the price. |
Singe computer, desktop (but noisy and hot!) | $9.5K | In addition to above upgrade costs$8.5K upgrade, pay extra: | Intel Xeon E5 4607 (V2 coming soon) | Again, 4 procs, but on one single motherboard. Those procs are twice the price. |
Typical compute cluster nodes | $7.3 |
| Just for price comparison. Only do if getting one of these 2 computers. | |
6-core proc (4-core capable). |
Details
For each option:
- Each proc (processor) is 6 cores. 4 total procs
- More cores/ proc are available, but much more expensive. (Ex. An 8 core proc is twice the price.)
- Each option has a total of 128GB RAM. And 4TB of HD storage over 2 hard drives.
...
- $410 for each 6 cores chip, 2-capable (Intel Xeon E5 2620 ; V2 coming soon)
- $890 for each 8 cores chip, 2-capable (Intel Xeon E5 2640 ; V2 coming soon)
- $890 for each 6 cores chip, 4-capable (Intel Xeon E5 4607; V2 coming soon)
- $1,600 for each 8 cores chip, 4-capable (Intel Xeon E5 4620; V2 coming soon)
Dropping from 64GB per node to 32GB per node drops about $250 per node ($500 for a 2-node system). (And 16GB instead of 32GB is saving very little money, of course.)
...
Compare proc prices
- E5-4600 2600v2 series chips ( v2 coming soon (new chips from September 2013 )
- E5-2600v2 4600 series ( new chips from September 2013 chips (v2 coming soon; current ones are ~one year old)
Other ideas to consider
- Confirm limiting factor by using CISER's service to help tune where to invest (cores, RAM, hard drives space).
- Cut down on hard drive space by using file server space, in certain situations.
- Merge your investment into an existing cluster. Shared resources cost much less than standing up your own, small cluster.
- Confirm operational value of a single, "powerful enough" system (say, most large jobs done in 24 hours or less), vs. multiple, less powerful systems.