Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Total flow summary: There is an average of about 7 over 6.4 tickets resolved by our group each workday,.

  • We averaged 138.5 resolved tickets per month.
  • Using 21.7 workdays per month, we come up with: 138.5 / 21.7 = ~6.4 resolved tickets per workday.
    • This number assumes (incorrectly!) no holidays observed or vacations taken, both of which reduce the number of workdays available.

Chemistry, for this 8 month period:

Flow summary: 123 tickets per month averages to about 6 5.7 tickets resolved per day.

 

Resolved within 1 day

Resolved in more than 1 day

Total

Oliver's analysis:

Avg. per month

Oliver's analysis:

Percent of volume

Lulu Zhu

38

53

91

11.49%

Michael E Hint

285

247

532

66.554%

Oliver B Habicht

132

104

236

29.524%

All others:

66

58

124

15.513%

Total

521

462

983

123 

...

 

Resolved within 1 day

Resolved in more than 1 day

Total

Oliver's analysis:

Avg. per month

Oliver's analysis:

Percent of volume

Lulu Zhu

2

1

3

--

Michael E Hint

34

35

69

8.656%

Oliver B Habicht

21

14

35

4.428%

All others:

9

12

21

2.617%

Total

68

56

124

15.5 

 ---------------------------------------------------------------

In the Month of Sept 2015, ChemIT (Assigned groups: Chemistry and Chemistry (L2)) and PhysIT (Assigned group: Physics) resolved x number of tickets. The are as follows (in a spreadsheet):

...

 

 

Resolved within 1 day

Resolved in more than 1 day

Total

Chemistry

Lulu Zhu

2

8

10

 

Michael E Hint

41

32

73

 

Oliver B Habicht

9

8

17

 

Roger W Garnett

16

8

24

 

Total

68

56

124

 ---------------------------------------------------------------

From Frank, 3/16/16: For January 2016:

...